null

Learn

Sidebar
CPI Approval for SaS authorization

CPI Approval for SaS authorization

Posted by Parley Labs / Jul 17th 2022

Before following this guide, have your Outdoor Small Cell installed in an outdoor location. It is recommended to have the Small Cell as high as possible (minimum requirement - 20ft) with the antenna facing an open line of sight. CBRS signa …